detention It’s time for another Friday progress report on Le South Wing. Although this week’s progress wasn’t as swift as we wanted it to be, a lot got done since last Friday nevertheless:

The kitchen wall tiles are fixed, grouted, sealed and cleaned. They are also much admired by everyone. Seems like we made the right choice.

All walls and ceilings have their first coat of paint, with the second coming on later today and tomorrow.

The nice, flat and level floor resembled a miniature version of the south England hillside. An attempt to fill the valleys has now been made, using a self-levelling compound. We can only hope that the corrections will be sufficient, and haven’t done more damage. The fix-up attempt has now cost us a four-day delay, one day for the fix, one for the drying out. Meanwhile, the joiner and tiler have both moved on to other jobs…

A few little bits here and there, such as the under-unit lights, have been sorted out.

Next steps include the kitchen floor tiles and the bamboo flooring, the moving in and the grand opening. Oh, and another four dozen little bits here and there. Next Friday’s progress report won’t be the last I am sure, but one of the last ones.

You can see the latest photos right here. All of them, actually. Most recent ones first.

 

Reblog this post [with Zemanta]